Call now · 900 264 644
Basque Country (Bizkaia, Gipuzkoa, Álava)

Solar panels in País Vasco with no investment or risk

Photovoltaic renting — residential and industrial — in País Vasco city and the entire province. Fixed monthly fee for 10, 15 and 20 years. You will pay fee + electricity bill always lower than your current bill and, at the end, the system is yours.

The essentials in 30 seconds

  • Basque Country has ≈ 1,700 sunshine hours per year (AEMET Bilbao). Lower than the south, compensated by Spain's highest industrial electricity cost.
  • PVGIS specific yield: ≈ 1,200 kWh per installed kWp per year.
  • Heavy and machine-tool industry: clear ROI due to high industrial kWh price.
  • Initial cost with AUREQIS: €0, no guarantees.
  • National coverage per project with a dedicated deployed technical team.

Why País Vasco is a great province for solar panels

The Basque Country has fewer sunshine hours than the south (≈ 1,700 h/year in Bilbao per AEMET) but Spain's highest industrial electricity cost and an intense B2B fabric where PV reduces bills significantly. Three clusters stand out for PV ROI: integral steel and machine-tool industry of Nervión, Bizkaia and Gipuzkoa, the Abra port and refinery, and a growing datacentre cluster in Bilbao-Bizkaia demanding electrical continuity + self-consumption + certified carbon footprint.

Satellite data from PVGIS (European Commission) confirms for País Vasco an annual global irradiation on a 35° south-tilted plane of ≈ 1,300 kWh/m² per year, with a specific yield of ≈ 1,200 kWh per installed kWp per year using standard 14 % losses. For comparison, País Vasco records ≈ 1,700 sunshine hours per year according to the AEMET Climatological Normals (1981–2010 period).

How much a solar installation produces in País Vasco

Installed capacity Estimated annual yield Covers the consumption of…
3 kWp ≈ 3,600 kWh / year Home, 2–3 people
5 kWp ≈ 6,000 kWh / year Average home with HVAC
8 kWp ≈ 9,600 kWh / year Detached house with pool or EV
15 kWp ≈ 18,000 kWh / year SME, retail or small industry
100 kWp ≈ 120,000 kWh / year Industrial warehouse, oil mill, mid-size hotel

The average Spanish household consumes 3,487 kWh per year according to IDAE (SPAHOUSEC III study), so even a small installation comfortably covers domestic consumption and surplus is offset on the bill under Royal Decree 244/2019.

The Basque Country case: steel, machine-tool and datacentres

Integral steel industry and metallurgical workshops of Nervión and the industrial belt of Sestao, Barakaldo, Portugalete concentrate brutal electrical consumption with 24/7 operation. Industrial roofs of 10,000+ m² perfect for 500 kWp to 3 MW self-consumption. Basque heavy industry is historically Spain's most energy-intensive.

The Gipuzkoa and Alto Deba machine-tool cluster (Mondragón, Bergara, Eibar, Elgoibar) — one of Europe's most important — operates with CNC lathes, milling machines, presses and machining centres of very high electrical demand. Despite modest local irradiation, outright payback drops below 8 years in many cases due to high industrial kWh price.

The Bilbao-Bizkaia datacentre cluster is growing rapidly as a Nordic alternative to the Madrid hub. Datacentres demand absolute electrical continuity (self-consumption + backup + certified carbon footprint). Typical combination: roof solar + batteries + generator + renewable PPA contracts.

In hospitality and gastronomy (Donostia-San Sebastián, Bilbao, Vitoria), Michelin-starred restaurants and boutique hotels benefit from PV + heat pump for climate control and DHW.

How much it costs to install solar panels in País Vasco in 2026

With AUREQIS, upfront cost is €0. The model is renting: we finance, install, legalise and maintain the entire system in exchange for a fixed monthly fee calibrated to be equal to or lower than the fixed part of your current electricity bill.

If you wanted to buy the system outright without renting, market ranges for a turnkey installation in País Vasco and the province are:

Residential

  • 3 kWp: 4.500–6.000 €
  • 5 kWp: 6.500–9.000 €
  • 8 kWp: 9.500–13.000 €
  • With battery: +€2,500 to +€5,000

Industrial / commercial

  • 15 kWp: 14.000–18.000 €
  • 50 kWp: 40.000–55.000 €
  • 100 kWp: 75.000–100.000 €
  • Typical payback: 5–8 years

Renting vs buying: comparison for País Vasco

Traditional purchase

  • Initial outlay €4,500–€200,000
  • Bank financing eats CIRBE and credit lines
  • You handle paperwork with utility and regional government
  • Maintenance and breakdowns on you
  • If the inverter fails at year 7, you pay
  • Payback 6–10 years for homes; 5–8 for SMEs

AUREQIS Renting

  • €0 upfront, no guarantees
  • Does not count in CIRBE
  • We handle complete technical legalisation
  • Maintenance, insurance and breakdowns included
  • Savings from month one
  • 100% tax-deductible fee for businesses
  • At the end of the contract, the system is yours

How much you can save with solar panels in País Vasco

Average Spanish household electricity spend was €47.80 per month in Q2 2024 (CNMC Households Panel), with an average household price of €0.24/kWh including taxes in H2 2024 (CNMC retail supervision).

In País Vasco, a 5 kWp installation produces about 6,000 kWh per year. With a consumption pattern aligned with sunshine hours (appliances, HVAC, hot water), self-consumption covers virtually all annual residential electricity use; surplus is offset on the bill under RD 244/2019. Typical net savings are between 50 % and 70 % of annual cost for an average home.

Grants and rebates in País Vasco 2025–2026

  • Municipal IBI (property tax) rebate. Basque councils (Bilbao, Vitoria-Gasteiz, Donostia, Barakaldo, Getxo) may apply discretionary IBI rebates for solar self-consumption under art. 74.5 LRHL. The Basque Government also manages proper incentives via EVE (Basque Energy Entity) with specific lines for industry. AUREQIS does not process these directly — we put you in touch with an external specialist advisor.
  • ICIO works tax rebate. Town councils may apply rebates of up to 95 % on the Construction, Installations and Works Tax under art. 103.2.b of the Local Treasury Law.
  • INEA Programme (Junta de Andalucía). Energy efficiency incentives managed by the Andalusian Energy Agency (Order of 24 April 2025, BOJA).
  • RD 477/2021 — National self-consumption programme. In force with an execution deadline of 30 June 2026. BOE.
  • IRPF (income tax) deduction (RDL 19/2021). Allows recovery of 20–60 % of cost depending on the works and the certified energy improvement. Agencia Tributaria.

Important: AUREQIS does not directly handle the documentation processing for these grants and rebates — our focus is design, installation, technical legalisation and maintenance. We put you in touch with a trusted external specialist who handles the application and follow-up that applies to your case.

What the installation process looks like

  1. Free energy study. We analyse your bill, your roof and your consumption pattern. We present a proposal with a fixed monthly fee and a 25-year savings plan.
  2. Technical legalisation. Technical project, declaration, connection with the utility and self-consumption registry with the regional government. We handle everything.
  3. Installation. 1–3 days for a home, 1–3 weeks for industry. In-house technicians.
  4. Commissioning and monitoring. App for real-time production and consumption.
  5. Maintenance throughout the contract. Cleaning, inverter inspection, insurance and technical support included.

Technology and warranties

Bloomberg Tier 1 panels (Jinko, LONGi, Trina, JA Solar, Canadian Solar) with efficiencies above 21 % and linear performance warranty ≥ 84 % at 25 years. Huawei, SMA, Fronius or Solis inverters with Wi-Fi monitoring. Anodised aluminium structures sized for warm climate and coastal environment where applicable (IEC 61701 certification against salt mist).

For industry we can integrate electrical backup systems and combine PV with heat pumps to multiply HVAC savings.

Service areas in País Vasco

We cover the entire region with a dedicated technical team deployed per project from our Andalusian offices. We work with clients in:

  • Bilbao
  • Vitoria-Gasteiz
  • Donostia-San Sebastián
  • Barakaldo
  • Getxo
  • Irún
  • Portugalete
  • Santurtzi
  • Sestao
  • Basauri
  • Errenteria
  • Leioa
  • Galdakao
  • Eibar
  • Arrasate-Mondragón
  • Bergara
  • Tolosa
  • Hernani
  • Zarautz
  • Beasain
  • Lasarte-Oria

AUREQIS has two physical offices in Andalusia (Sevilla and Motril) and runs projects throughout Spain. For País Vasco we coordinate design, technical legalisation and installation with in-house personnel deployed for the entire works execution. For studies and follow-up maintenance, contact our national number 900 264 644.

Frequently asked questions about solar panels in País Vasco

  • 01 Does solar self-consumption make sense in the Basque Country with less sun?

    Yes, especially for industry and B2B. The Basque Country has Spain's highest industrial electricity tariff. Every kWh self-consumed is worth more than in the south — industrial PV outright payback is typically 7 to 10 years despite lower irradiation.

  • 02 How much does a solar installation produce in the Basque Country?

    Per PVGIS, a PV installation in Bilbao south-facing at 30° tilt produces about 1,200 kWh per installed kWp per year. Vitoria-Gasteiz, being inland with less Atlantic fog, produces ≈ 1,280 kWh/kWp/year. A 5 kWp home in Bilbao generates ≈ 6,000 kWh annually; a 1 MW industrial warehouse produces ≈ 1,200,000 kWh annually.

  • 03 Do you cover the Basque Country if your offices are in Andalusia?

    Yes. Bilbao is 8 h via A-66/AP-66 from Sevilla; we coordinate each project with a dedicated deployed technical team for the entire works execution.

  • 04 For a Bilbao-Bizkaia datacentre, what sizing makes sense?

    New generation datacentres in Bizkaia ask for absolute electrical continuity and certified carbon footprint for their hyperscale contracts. Typical combination: PV on roof + batteries (BESS) for load smoothing + generator as ultimate backup + renewable PPA. Typical in-roof PV plants: 500 kWp to 2 MW per building.

  • 05 For a machine-tool warehouse in Gipuzkoa?

    Alto Deba (Arrasate-Mondragón, Bergara, Oñati) and Goierri (Beasain, Ordizia) machine-tool workshops operate with sustained daytime consumption and 2,000-6,000 m² industrial roofs. Typical 100-400 kWp plants on roof cover 25-45 % of annual electricity consumption.

  • 06 Who processes the IBI rebate and EVE aid?

    AUREQIS handles design, installation, technical legalisation and maintenance. Documentation processing for the IBI rebate before Basque councils, EVE aid or national (RD 477/2021, IRPF deduction) is not done by us directly — we put you in touch with an external specialist advisor.

Contact for projects in País Vasco

For a free energy study and personalised proposal in País Vasco:

Phone: 900 264 644 · Email: hola@aureqis.com
Hours: Monday to Friday, 10:00–14:00 and 17:00–20:00

Ready to start in País Vasco? Request your free study with no obligation. You will receive a proposal with the exact monthly fee for your case in less than 48 hours.

Request a free study